Welcome to Iightstrade.com!

12m LED bulb aging line

MOQ :1 piece

Lead Time :18 Days

Seller Support : Trade Authenticity Guaranteed & Accepting

Payment : L/C,T/T,Western Union, Money Gram, Credit Card, Paypal

Product details

Supply Ability

  • Supply Ability:3 piecesWarranty(Year):1 Year

Packaging & Delivery

  • Length:24.7 cmWidth:11.2 cm
  • Height:14.6 cmLogistics Weight:1180.000 kg/piece

Product Specifications

  • Brand name:no

Product Description

12M LED bulbs aging line

一、

Project

LED bulbs aging line

二、

Specifications  

12000L×1000W×800Hmm

Quantity

One set

四、

Structure

Ring chain conveying, chain boards holder aging, frequency control of motor speed

五、

Function and feature

This equipment is professional for led bulbs inspection.  Through high voltage, normal voltage, low voltage, roaming and fluctuation voltage, impact functions. High temperature zones to observe whether short-circuit, capacitance burst and black points will occur. Also used for inspecting the simulation daily use of LED lamp cycling circuit and roaming seasoning area. Easy to cooperate.

六、

Specifications :

 

1.

Motor

adopt Taiwan brand 1500w east cropland motor, WPS80 type  1:60 of the speed reducer, the domestic well-known brand 2 HP's island converter, frequency conversion step less speed regulation, linear speed0.3—2M/min can be adjusted.

2.

Machine body and strand

Made of 40×40 rectangle steel pipe by welding. Upper and lower body side protection using special aluminum alloy aging line dedicated. Protective board is made of 1.2mm cold steel sheet by bending. Support legs are equipped with galvanized adjustable soles.

3.

Conveying chain

Double-pitch single-side-ear double-hole chain manufactured by Shanghai Chain Factory, 20m long.

4.

Chain plate

Made of 2mm thick 800×148×15mm cold rolling sheet, total 140 plates.Each plates for 12pcs of E27 bulbs . And equipped with high marks broken small circuit breaker. Road conductive bottom of the chain plate mounting system(copper), each installation of two conductive blocks, each plate were installed 2.

5.

Daily output

The aging line once can aging 1680pcs LED bulbs. The aging time for one hour. One day can work 10 hours. Total daily output is 16800pcs of LED bulbs one day.

6.

Stop light shield:

On both sides edges of the seven sections equipped a stop light shield plastic plates, using 4mm tawny organic glass plate and 40X40 aluminum alloy combinations and become effective damping light intensity to your eyes, better protect your eyes.

7.

Conductive slot

Up and down with all conduction channel rail, the insulating rubber sheet, and assembly stainless steel electric tank.

8.

Constant temperature area:

Complete thermostatic system USES electric heating type, set for a period of two pieces of 2000 w/set of electro thermal heating plate, automatic constant temperature at room temperature - 60 ℃, digital temperature control instructions.

9.

Detecting of the impact of circuit:

Set any zone as cycling control zone. Shock-time by the PLC microcomputer control.

10.

Detecting aging roaming zone:

Set any zone as an roaming zone, voltages fluctuate with the time change.180 - 220 - 250 the uninterrupted change, roaming area time is controlled by PLC Micro computer. (The voltage can adjustable by your requirement.)

11.

Whole line voltage zones:

Totally five voltage regulators. Each one is 10kw , the effective voltage area altogether designs seven zones, voltage regulator three of them 0-- 250 v adjustable, two of them voltage regulator 0-- 300 v adjustable .

12

Touch screen:

The whole system adopts 7.5 inch type China brands Xinjie touch screen control, the impact and the roaming time can be adjusted according to customer’s demand, software and PLC language will be in English only.

13.

Electric control:

Voltage, temperature control instructions adopted digital display type, the whole system adopts PLC control, voltage regulator for five (5), using a power distribution control cabinet installation. When convenient to pull with urgent stop switch lamp can stop in time.

14.

Machine color

Computer writes.

七、

Quotation

USD12450  FOB ZHONGSHAN.

八、

Remarks This quotation 15 days with effect.

 

1.

Shipment and installation

The buyer is responsible for shipment. The seller provide free installation and operating training to the buyer ,,buyer provide room and food to the engineer during installation .

2.

Equipment specification

This device does not include the power cords, electrical control, closed to intake and other peripheral equipment.

3.

Warranty

Under the condition of non-artificial damage one year warranty, voltage regulator, motor, inverter, touch screen main electrical parts warranty 1 year.

4.

Delivery

Within 20 days after receipt your advance deposit.

5.

Payment

Payment by T/T ,30% in advance ,the balance before shipment .

 

6.

Packing :

The quotation contain packing fee.

九、

 

 

Packing picture :


You May Like